Skip to content
MARA registered MARN 1795282 +61 404 690 227

Processing times · Subclass 191

How long does the subclass 191 visa take? (November 2026)

Reviewed by a registered migration agent · MARN 1795282
Updated

As at 2 November 2026, Home Affairs reports that 75% of Permanent Residence (Skilled Regional) visa (Subclass 191) applications (Regional Provisional Visa stream) were finalised within 8 months, and 90% within 11 months. In September 2026 the 75% figure was 9 months. These are official global processing times for applications decided in the previous month, not a promise for any individual case.

Subclass 191 processing times by stream

Stream75% of applications90% of applications75% in September 2026
Regional Provisional Visa8 months11 months9 months

What to expect when you apply for the subclass 191

How the application moves

  1. You lodge once you have held the 491 or 494 for at least three years and can show the income requirement with Australian Taxation Office notices of assessment for three of those years.
  2. Home Affairs checks compliance with the regional visa's conditions (living, working and studying in a designated regional area) and the income evidence, then health and character where needed.

What most often slows a 191 application

What to have ready before lodging

What the 75% and 90% figures mean

Home Affairs publishes the time within which it finalised 75% and 90% of the applications decided in the previous month. Three in four applicants got a decision faster than the 75% figure; one in ten waited longer than the 90% figure, almost always because the application was incomplete, needed health or character follow-up, or sat outside the current processing priorities. The figures move every month, which is why we keep a history on the processing-times tracker.

Frequently asked questions

How long does the 191 visa take to process in November 2026?

Home Affairs reports that 75% of Permanent Residence (Skilled Regional) visa (subclass 191) applications in the Regional Provisional Visa stream were finalised within 8 months and 90% within 11 months, as at 2 November 2026.

What do the 75% and 90% figures mean?

They are the times within which Home Affairs finalised 75% and 90% of the applications it decided in the previous month. Three in four applications were decided faster than the 75% figure; one in ten took longer than the 90% figure, usually because the application was incomplete or needed extra checks.

Can a 191 visa be processed faster?

There is no paid priority service for the 191. The things that reliably shorten processing are lodging a complete, decision-ready application (identity, health, character and every eligibility document attached at lodgement), responding to any request for information quickly, and falling within the priority sectors set by the current ministerial direction.

Related visas: processing times and costs

Source: Department of Home Affairs — global visa processing times, as at 2 November 2026. Cost: subclass 191 visa fees. Eligibility and steps: 191 Visa: PR After a 491 or 494 (Tax Records, Fee, Timing). General information only, not migration advice.

Your move to Australia

Applying for a subclass 191 visa?

Book a free first call and we'll talk through your options and the next steps. Flat-fee pricing if you proceed — no surprises.